Bathroom Remodeling

From dated tub-and-tile to a bathroom you want to use.

Tiled walk-in showers, new vanities, proper waterproofing and ventilation — for homes in Rodeo, Hercules, Pinole, Martinez and across Contra Costa County.

  • Licensed & insured — California CSLB #1123274
  • Class B general contractor
  • Free in-person estimates
  • Locally owned, based in Crockett

Start your bathroom estimate

Three fields. We call you back to set up a walkthrough.

Add details (optional)

We call you back to schedule a walkthrough. Pricing comes after we have seen the space — never over a form.

Recent work

Same room, same footprint

A common bathroom in a 1970s Rodeo home. The tub-and-tile surround, sliding glass door and oak vanity came out; a full-height tiled walk-in shower, new vanity and brass fixtures went in.

BeforeOriginal 1970s bathroom in Rodeo with a tub-and-tile surround, sliding glass shower door and a dark oak vanity
AfterThe same Rodeo bathroom after remodeling, with a full-height marble-look tiled walk-in shower, glass door, brass fixtures and a new vanity
1003 Viewpoint Blvd, Rodeo — common bathroom, before and after.
Scope

What a bathroom remodel covers

Every job is scoped at the walkthrough, but this is the shape of a typical full remodel.

  • Demolition down to the studs where needed
  • Waterproofing and backer board before any tile goes on
  • Tiled showers, tub surrounds and floors
  • Vanities, tops, sinks and mirrors
  • Toilets, valves, trim and fixtures
  • Exhaust ventilation sized for the room
  • GFCI outlets and lighting
  • Rot and subfloor repair found behind the old work

If we open a wall and find rot, a leak or a vent going nowhere, you hear about it that day — with what it costs to fix — before anything gets closed back up.

Common questions

Bathroom remodel questions

Should I replace the tub with a walk-in shower?

It is the most common change we make, and in a house with more than one bathroom it usually makes sense. If it is the only bathroom in the home, think about resale before removing the last tub. We will walk through both options with you rather than pushing one.

What is behind the walls of an older bathroom?

Often more than expected — old galvanised supply lines, a fan vented into the attic rather than outside, and water damage around the tub flange or under the subfloor. We open things up before we finalise anything, and if we find something we tell you what it costs to do right before we proceed.

How long does a bathroom remodel take?

A single bathroom is typically a few weeks on site once materials are staged, with the tile and its setting time driving much of the schedule. You get a written schedule with your estimate.

Do you waterproof behind the tile?

Always. A tiled shower is only as good as what sits behind it — the membrane, the pan, and the sloping. Tile over the wrong substrate looks fine for two years and then rots the wall out. This is the part of a bathroom that no one sees and that determines whether it lasts.

Get a real number for your bathroom

We walk the space, measure, and give you a written line-itemed estimate — so you can see what each part of the job actually costs.

  • Licensed & insured · CSLB #1123274
  • Free in-person estimates
Call nowFree estimate